Overview
Environmental
>>
Transportation
Surveying
Governmental
Industrial
Albany
229.883.0332
229.883.0543 FAX
Augusta
706.261.4040
706.261.4042 FAX
Savannah
912.354.4499
Smyrna
770.952.2481
770.955.1064 FAX
info@speng.com
|
Services > Environmental
Wastewater Treatment and Sewer Collection Systems
- Sewer System Evaluations
- Sewer System Extension

- Sewage Pump Stations
- Watershed Assessment
- Industrial Pre-Treatment
- Treatment Process Evaluation
- Mechanical Plant
- Pond Systems
- Sequencing Batch Reactors (SBR)
- Anaerobic Lagoon
- Constructed Wetlands
- Land Application System (LAS)
- Stream Discharge
- Inflow/Infiltration Studies
- Smoke Testing and Manhole Inspection
- Rehabilitation of Manholes and Sewers
- Sewer Flow Metering and Monitoring
- Risk Management Plan (RMP)
- Master Planning
Water Pipelines, Water Supply, Treatment, and Storage
- Source Protection

- Groundwater (wells) or Surface Water Source
- Distribution System Design
- Computer Modeling of Distribution system
- Surface Water Treatment
- Storage (Elevated Tank or Ground Storage Reservoir)
- Booster Pump Station
- Consumer Confidence Report (CCR)
- Risk Management Plan (RMP)
- Vulnerability Assessments
- Master Planning
- Groundwater Exploration
- Watershed Protection Plans
- Drought Contingency Plans
- Reservoir Management Plans
back to top^
Stormwater Drainage, Planning, and Design
- Stormwater Management Studies

- Hydrology and Hydraulic Studies
- Drainage Calculations
- Stormwater Modeling
- Detention and Retention Pond
- Storm Sewer System Design
- FEMA Flood Hazard Mitigation
- NPDES Permits
- Erosion & Sediment Control
Solid Waste Landfills
- Closure & Post-Closure Plans
- Sub-Title “D” Landfill
- Leachate Treatment
- Groundwater Monitoring Plan
- Transfer Station
- Master Planning
- Rate Study
- Grant & Loan Funding Application
back to top^
|