 3/23/07 BT Brown WTP |  3/6/06 Admin. Bldg. Drywall
|  3/6/06 Carbon Feed System
|
 3/3/06 Painting Tank Farm Walls |  3/2/06 Shooting grades for roadway leading to the RWPS |  3/1/06 MB Panels in the Blower/Electrical Room |
 2/7/06 MB MCC in the Blower/Electrical Room |  1/30/06 Admin Bldg Siding |  1/20/06 HSPS metal roof
|
 1/20/06 Loading dock roof
|  1/16/06 Pipe Gallery process piping |  1/9/06 Loading dock columns |
 12/21/05 Flocculation Basin No. 2 finishing walls |  12/13/05 Sedimentation Floculation Basin |  12/12/05 Installing single-ply membrane roof system at the Administration Building |
 12/11/05 Administration Building |  12/8/05 Setting roof trusses at the High Service Pump Station |  11/29/05 Installing metal stud walls on the 2nd floor of the Administration Building |
 11/22/05 Setting HS Generator |  11/18/05 HS Generator - Slab pour |  11/17/05 Floc./Sed. Basin Walkways |
 11/17/05 Admin. Bldg. - Roof Decking |  11/16/05 HSPS - Slab pour |  11/10/05 Administration Building – Installing roof decking |
 11/9/05 High Service Pump Station – Backfilling with # 57 stone |  11/9/05 Flocculation/Sedimentation Basin Walkways
|  11/7/05 High Service Pump Station – Under-slab electrical |
 11/3/05 Administration Building – Brick at West wall of Room 206 |  11/2/05 Administration Building – Roof Trusses |  11/2/05 Sedimentation Basin No. 2 – Walkway |
 10/26/05 High Service Pump Station – Footings |  10/26/05 Site grading east of the Alum Ponds |  10/21/05 Lobby Stairs |
 10/19/05 Alum Pond - Splash Pads at Inlet Pipe |  10/19/05 Grading at South Alum Pond |  10/19/05 Grading at Clearwell |
 10/19/05 Sedimentation Basin No. 1 - Walkways |  10/12/05 RWPS - Brick |  10/11/05 Administration Bldg. - 2nd Floor Walls |
 9/8/05 Just another warm day at BT Brown Job Site |  9/8/05 Site piping Line H & I (Picture at vault locations) |  9/8/05 Electrical room slab at the Admin. Bldg. |
 9/8/05 Admin. Bldg. split face accent block (North Wall of Maint. Room) |  9/6/05 Admin. Bldg. CMU walls (West Wall) |  9/2/05 Setting Hollow-Core planks for bridge to Raw Water PS |
 9/2/05 Footing pour for South Alum Pond inlet structure |  9/2/05 South Alum Pond |  8/25/05 Raw Water Pump Station |
 8/24/05 Clearwell Tank - Complete |  8/23/05 Flocculation and Sedimentation Basins |  8/18/05 Conduit for chemical feed rooms |
 8/2/05 The Fifth Element inside the Clearwell Tank |  8/2/05 RWPS Bridge Footings/Columns |  8/1/05 Flocculation & Sedimentation Basin Walls |
 7/29/05 RWPS Pump House Walls |  7/27/05 Filter Haunch Walkway |  7/27/05 Pipe Gallery Stairs |
 7/26/05 Admin Building CMU Construction |  7/6/05 Raw Water Pump Station |  7/5/05 Chemical Feed Walls |
 6/23/05 Flocculation and Sedimentation Basin Slab |  6/17/05 Admin Bldg Footings |  6/05 Chemical Feed Slab |
 6/05 Admin Bldg Slab |  6/13/05 Raw Water Pump Station: Intake Pipes |  6/13/05 Flocculation and Sedimentation Basins rebar |
 6/9/05 Chemical Feed Storage Area |  6/3/05 Raw Water Pump Station: Elevated Slab |  6/2/05 Clearwell Tank |
 5/26/05 Raw Water Pump Station in-slab conduit |  5/26/05 Raw Water Line "H" (Concrete encasement) |  5/26/05 Install East wall forms at Filters |
 5/26/05 Clearwell Tank Dome |  5/25/05 Inside of Clearwell Tank Dome |  5/20/05 Raw Water Pump Station bottom rebar mat at FF |
 5/19/05 Clearwell walls complete, start dome |  5/11/05 Forming elevated slab for Raw Water PS |  5/13/05 2nd wall lift of Pipe Gallery (North Wall) |
 5/12/05 Clearwell Tank Wall Construction |  5/9/05 Clearwell Tank Wall Construction |  5/3/05 Clearwell Tank Wall Construction |
 5/2/05 Clearwell Tank Wall Construction |  4/1/05 S&P crew on the scene or is it the Village People? | |